Scheduling tools and resources usually treat material flow and people as fixed time allowances, while in practice these often set real capacity. Schedules overestimate what the plant can do, and the gap only shows in production. Simple first in, first out, unoptimised queuing are often enforced due to lack of better solutions.
A planning-and-execution loop: an optimiser makes the plan, and a physically-based simulation executes it on a model of the plant. The plant is described by configurable layout, resources, rules, so the same tool can model different factories.
OLT contribution
The coupling of optimisation and physically resolved simulation, the configurable plant model, a standard event-log interface between simulation and visualisation, and the 3D digital twin with browser replay.
Plans are checked against physical reality before they reach the shop floor. Planning, simulation and visualisation are decoupled through explicit data contracts, which makes the tool easy to adapt. Weeks of simulated production can be replayed and inspected interactively in a 3D visualiser.
First application: an automated machining cell.